Bathroom Renovations
in The Entrance
Looking for bathroom renovations in The Entrance? We design, waterproof and build complete bathrooms throughout The Entrance and the surrounding the Central Coast, with the same licensed team from the first measure to the final silicone.

Bathroom renovations in The Entrance
Homes in The Entrance (2261) range across apartments and harbourside homes, and every renovation is built to suit the home and meet Central Coast Council requirements. Whether it's a compact ensuite or a full main-bathroom rebuild, we manage the licensed plumbing, electrical and waterproofing — so you deal with one team, not five.
From the first drawing to the final clean, every trade is handled in-house, so your renovation stays on scope, on schedule and to one quality standard.
Why The Entrance chooses INNA
- Licensed NSW builder, fully insured
- Fixed, itemised quotes — no surprises
- Waterproofing to AS 3740
- One crew, strip-out to handover
- Servicing The Entrance & the the Central Coast
Holiday units and waterfront apartments at The Entrance
The Entrance is holiday-let country. A lot of what we renovate here are units in sixties and seventies strata blocks along the waterfront, with beach houses and fibro cottages in the streets behind them. Two things shape every job. The first is salt and humidity — tapware pits, exhaust fans fail early, and mould comes back through grout that was never sealed properly, so we specify fittings and ventilation that suit a coastal bathroom rather than an inland one. The second is the calendar. If the place is a holiday rental, the renovation has to fit between bookings, which means an agreed start date, materials on site before demolition, and a finish date we actually hold to. For unit blocks we prepare the strata paperwork up front, and we are happy to work with owners who live in Sydney and cannot be here daily — photos and updates at every stage, so you are not driving up to check on us.
We prepare the renovation bylaw paperwork North Sydney strata committees expect — scope of works, contractor insurances, waterproofing methodology — and schedule the noisy stages inside permitted building hours. Membranes go down to AS 3740 with proper cure time and the installation is documented for the strata record, which also protects you at sale.
The other The Entrance specialty is making small rooms work. Wall-hung vanities, recessed niches, frameless or sliding screens and considered lighting reliably make a three-by-two metre apartment bathroom feel far larger, and designing around the building's existing plumbing stacks keeps both cost and approvals simple.
Everything your bathroom needs, in one job
A clear path, start to finish
Consult & design
We visit, measure up and hand you a clear, itemised quote and plan.
Strip-out & waterproof
Demolition, plumbing & electrical rough-in, then waterproofing to AS 3740.
Tile & install
Tiling, vanities, screens and tapware fitted by one coordinated crew.
Finish & handover
Detailing, a full clean and a walkthrough — handed over ready to use.
Built properly, by one team
Licensed & insured
A licensed NSW builder — your project is compliant, certified and covered.
Fixed, itemised quotes
No surprises. You get a clear scope and price before we start.
One crew, start to finish
The same team from strip-out to handover — no juggling trades.
Built to last
Quality materials and proper waterproofing, backed by real workmanship.
A few finished bathrooms



Bathroom renovations in The Entrance — questions, answered
How much does a bathroom renovation cost in The Entrance?
Cost depends on the size of the room, any layout changes and the finishes you choose. After a quick site visit in The Entrance we give you a fixed, itemised quote, so you know the price before any work starts.
How long will my The Entrance bathroom renovation take?
Most bathrooms take around 3–4 weeks on site. We give you a schedule before we start and keep you posted at each stage.
Do you handle waterproofing and council approvals?
Yes. Waterproofing is done to Australian Standard AS 3740 with proper cure time, and we manage the licensed plumbing and electrical work plus any Central Coast Council requirements your job needs.
Which areas near The Entrance do you cover?
We work right across the the Central Coast and all of Sydney, including North Sydney, Mosman, Hunters Hill.
How long does strata approval take in The Entrance?
It varies by building, but complete paperwork is what moves it fastest. We supply the scope, insurances and waterproofing details up front, which is what most committees are waiting on.
Can you fit the job between holiday bookings?
Yes. Tell us the window and we will tell you honestly whether it fits. Materials are ordered and on site before demolition starts, and a full bathroom is generally three to four weeks once work begins.
Renovating a bathroom in The Entrance?
Free, no-obligation quote — usually back to you within one business day.
INNA