Home › Bathroom Renovations › Castle Hill
The Hills District · Sydney 2154

Bathroom Renovations
in Castle Hill

Looking for bathroom renovations in Castle Hill? We design, waterproof and build complete bathrooms throughout Castle Hill and the surrounding the Hills district, with the same licensed team from the first measure to the final silicone.

Bathroom renovations Castle Hill — a dark marble walk-in shower
Local builder

Bathroom renovations in Castle Hill

Homes in Castle Hill (2154) range across apartments and harbourside homes, and every renovation is built to suit the home and meet The Hills Shire Council requirements. Whether it's a compact ensuite or a full main-bathroom rebuild, we manage the licensed plumbing, electrical and waterproofing — so you deal with one team, not five.

From the first drawing to the final clean, every trade is handled in-house, so your renovation stays on scope, on schedule and to one quality standard.

Why Castle Hill chooses INNA

  • Licensed NSW builder, fully insured
  • Fixed, itemised quotes — no surprises
  • Waterproofing to AS 3740
  • One crew, strip-out to handover
  • Servicing Castle Hill & the the Hills district
Apartments & strata

Family bathrooms and ensuites in Castle Hill

Castle Hill is big blocks and big houses — brick veneer from the eighties and nineties, double-storey family homes through the 2000s, and newer estates on the edges. That changes what a renovation looks like. Most jobs here are not one bathroom, they are a main bathroom, an ensuite and often a powder room, and the family cannot lose all of them at once. We stage the work so there is always a working shower in the house, which usually means finishing the ensuite before the main bathroom is opened up. Upstairs bathrooms bring their own demand: the membrane is sitting directly above a living room or kitchen, so waterproofing is checked and photographed before a single tile goes down. Anything structural, or any new wet area where there was not one before, goes through The Hills Shire Council and we handle that paperwork rather than leaving it with you.

We prepare the renovation bylaw paperwork North Sydney strata committees expect — scope of works, contractor insurances, waterproofing methodology — and schedule the noisy stages inside permitted building hours. Membranes go down to AS 3740 with proper cure time and the installation is documented for the strata record, which also protects you at sale.

The other Castle Hill specialty is making small rooms work. Wall-hung vanities, recessed niches, frameless or sliding screens and considered lighting reliably make a three-by-two metre apartment bathroom feel far larger, and designing around the building's existing plumbing stacks keeps both cost and approvals simple.

What's included

Everything your bathroom needs, in one job

Design & 3D layout
Strip-out & demolition
Plumbing & electrical rough-in
Waterproofing to AS 3740
Floor & wall tiling
Custom vanities & stone tops
Frameless glass screens
Niche & feature lighting
Final clean & handover
How it runs

A clear path, start to finish

STEP 01

Consult & design

We visit, measure up and hand you a clear, itemised quote and plan.

STEP 02

Strip-out & waterproof

Demolition, plumbing & electrical rough-in, then waterproofing to AS 3740.

STEP 03

Tile & install

Tiling, vanities, screens and tapware fitted by one coordinated crew.

STEP 04

Finish & handover

Detailing, a full clean and a walkthrough — handed over ready to use.

Why INNA GROUP

Built properly, by one team

Licensed & insured

A licensed NSW builder — your project is compliant, certified and covered.

Fixed, itemised quotes

No surprises. You get a clear scope and price before we start.

One crew, start to finish

The same team from strip-out to handover — no juggling trades.

Built to last

Quality materials and proper waterproofing, backed by real workmanship.

Recent work

A few finished bathrooms

Bathroom renovations Castle Hill — a white vanity with grey floor tilesBathroom renovations Castle Hill — a white vanity with a stone benchtopBathroom renovations Castle Hill — a wall-hung toilet with a framed shower screen
Good to know

Bathroom renovations in Castle Hill — questions, answered

How much does a bathroom renovation cost in Castle Hill?

Cost depends on the size of the room, any layout changes and the finishes you choose. After a quick site visit in Castle Hill we give you a fixed, itemised quote, so you know the price before any work starts.

How long will my Castle Hill bathroom renovation take?

Most bathrooms take around 3–4 weeks on site. We give you a schedule before we start and keep you posted at each stage.

Do you handle waterproofing and council approvals?

Yes. Waterproofing is done to Australian Standard AS 3740 with proper cure time, and we manage the licensed plumbing and electrical work plus any The Hills Shire Council requirements your job needs.

Which areas near Castle Hill do you cover?

We work right across the the Hills district and all of Sydney, including North Sydney, Mosman, Hunters Hill.

Can you renovate two bathrooms without leaving us without a shower?

Yes, and in Castle Hill that is how we usually plan it. The ensuite is finished and signed off first, the family moves across to it, then the main bathroom comes out. It adds a little time overall, but nobody is showering at a neighbour's place for three weeks.

Do you handle upstairs bathrooms above living areas?

Regularly. The difference is in the waterproofing and the substrate — the membrane is photographed at every stage and given full cure time before tiling, because a leak above a ceiling is a far more expensive problem than one on a slab.

Renovating a bathroom in Castle Hill?

Free, no-obligation quote — usually back to you within one business day.